PDF Print E-mail

Compass Version1.2

<< prev
 TOC 
next >> 

Perforce Build Plan Example

The Perforce build plan example has three steps to it:

Step 1: We starts with creating a new project and adding a new build plan, we add two build steps and configure the build plan, and schedule the build to run every few hours.
Step 2: We add a build step to do a p4 sync and turn on incremental builds.
Step 3: We change the checkout build step to be a revision checkout and set default values so it will still build every few hours; then we schedule a revision trigger.

 

bottom
top
Copyright © 2010 Anx Labs. All Rights Reserved.
Anx Labs Inc. - 2251 Double Creek Dr. Ste. 604, Round Rock TX 78664 - 1-888-900-6819
bottom