PDF Print E-mail

Compass Version1.1

<< prev
 TOC 
next >> 

Build Details

The Build Details section on the build results page shows some basic information about the build run, including links to the user who initiated it and the build run's status.  Below is an example of the build details section:

As you can see from this image, there are 6 parts to the build details screen, each of these parts is described in the table below:

Build Details information Description
Builder
The 'Builder' is a link to the user who initiated the build.  For regularly scheduled builds this is the user who scheduled the build.  For source-control revision triggered build, if a user has a source-control alias set up that matches the user that submitted the change to the repository then that user is displayed, otherwise it is the person who scheduled the revision build.
StatusThe 'Status' is the Compass status of the build, it can be Success, Failed, Pending, Canceled, Aborted, or Unknown.  Definitions for each of these are provided in the Build History section of the documentation.
Build Plan
The 'Build Plan' is a link to the build plan page.
Started
'Started' is the date and time that the build run was started on the build client.
Finished
'Finished' is the date and time that the build run completed the last build step that was run on the build client. 
Project
The 'Project' is a link to the Project Details page.

 

 

bottom
top
Copyright © 2010 Anx Labs. All Rights Reserved.
Anx Labs Inc. - 2251 Double Creek Dr. Ste. 604, Round Rock TX 78664 - 1-888-900-6819
bottom